Golf courses
0 billion gallons
“A projected 1.63 million acre-feet” of water applied in 2024, about 531 billion gallons. GCSAA, December 2025. Down 31% since 2005.
Field Notes · Jonathan Jackson
The truth about data centers and water. Official numbers, named sources.
Scenes are AI generated illustrations, not photos of real sites.
Scroll to go inside
Inside the building
US data centers consumed water on site for cooling in 2023: a “66-billion-liter total.” About 17 billion gallons.
Lawrence Berkeley National Laboratory, 2024
Five drops
Google measured the median Gemini Apps text prompt at 0.26 ml, “about five drops.” That’s cooling at the data center only.
Google, August 2025
Every rack runs on power
Cooling is the part you can see. Most of the water hides somewhere else. Follow the power.
Follow the power
In 2023, nearly 800 billion liters of water sat behind the electricity US data centers used. Most of the water is at the power plant.
Lawrence Berkeley National Laboratory, 2024
Down to the copper
The chip runs on electricity, and the water in this loop carries its heat away. Making the electricity takes water too, and that is where most of a data center’s water goes.
The cooling loop
Cleaner power that doesn’t need cooling water fixes more than any cooling tower ever will.
My take
Out to the river
US golf facilities applied “a projected 1.63 million acre-feet” of water in 2024. About 531 billion gallons applied, not consumed. Still more than all data centers use, power plants included.
GCSAA, December 2025
Locally, it’s real
Roughly two thirds of new or planned US data centers from 2022 to 2025 sit in water stressed areas.
Ceres, Water Behind the Watts, 2026
Look closer
In the US, one fifth of data center servers’ direct water footprint comes from moderately to highly water stressed watersheds.
Siddik, Shehabi and Marston, Environmental Research Letters, 2021
Zoom out
Minor nationally. Real locally. Both are true. Build them where the water and the power can handle it, with the town at the table.
We go in
Fear grows when nobody shares the numbers. Here they are, with the sources, so you can decide.
Loading the journey
The numbers, to scale
Tap each one to see its water. Both tanks use the same scale. Golf counts water applied; data centers count water consumed.
0 billion gallons
“A projected 1.63 million acre-feet” of water applied in 2024, about 531 billion gallons. GCSAA, December 2025. Down 31% since 2005.
0 billion gallons cooling + 0 at the power plants
A “66-billion-liter total” on site in 2023, about 17 billion gallons. Nearly 800 billion liters behind the electricity in 2023, about 211 billion gallons. Lawrence Berkeley National Laboratory, 2024.
In family terms
Nationally, the cooling water every US data center used in 2023 matches the home water of up to 155,000 families for a year. Add the water behind their electricity and it’s up to 2.1 million. That’s the national scale. Locally, one site can still strain one town’s system, so where you build matters.
Each house is 10,000 families. EPA WaterSense (updated 2026) says the average American family uses “more than 300 gallons of water per day at home.” We used 300, about 109,500 gallons a year, so the family count is an upper bound. Data center figures are for 2023: about 17 billion gallons cooling on site and about 211 billion behind the electricity (Lawrence Berkeley National Laboratory, 2024). The math is ours.
Tanks are drawn to scale in gallons, up to 800 billion. Data center figures count water consumed; golf counts water applied, so these are not identical measures. Photos are AI generated illustrations. This is not a knock on golf.
Why I wrote this
The more I looked at the numbers, the more I wanted people to see them.
I would love to help plan these data centers, bring the community in early, and push for training so the people who live there get the jobs.
Listen, I may lose work over this. That matters, and it sucks. I can't play both sides. Maybe I already am. But I have to help build the future.
If this page leaves you feeling unheard or left out, I'm sorry. That's the opposite of what I want.
Don't take my word for it. Paste this page into your own assistant or agent and ask it to check the numbers and the sources.
Fair is fair
Most people don't want one next door. In a March 2026 Gallup poll, 71% opposed a data center for AI in their area. In a June 2026 CBS News/YouGov poll, only 16% said they know a lot about data centers.
Some of it has turned ugly:
People fear what they can’t see when no one shows them the numbers. Some deals got signed under NDAs before residents heard a word. A lot of folks see AI coming for their job. I understand all of it.
What people say about data centers, checked against the published record.
Myth“Every AI prompt drinks a bottle of water.”
FactThe study behind the bottle said one 500 ml bottle covers about 10 to 50 responses, counting the water used to make the electricity too. Google measured its median Gemini text prompt at 0.26 ml, about five drops, counting cooling only.
Li et al., UC Riverside, 2023, revised 2025 · Google, Aug 2025
Myth“Data centers drain every town’s water.”
FactVirginia’s legislative watchdog found most data centers use about as much water as a large office building, or less. Big campuses can use far more.
FactLocally, it can be real. In The Dalles, Oregon, a third of the town’s water went to Google’s sites in 2024. Where you build matters.
JLARC Virginia, Dec 2024 · OPB, Jan 2026
Fact“It can raise my bill.”
On PJM, the biggest US grid, forecast peak demand jumped more than 5,400 MW, “driven largely by data center expansion,” and PJM expected some bills to rise 1.5% to 5%. Regulators are pushing back: in Georgia, Georgia Power’s new customers above 100 MW can be held to their own grid costs, longer contracts and minimum bills, and Virginia’s version for Dominion customers starts January 1, 2027. These numbers are specific to each grid and can change year to year.
PJM, Jul 2025 · Georgia PSC, Jan 2025 · Virginia SCC, Nov 2025
Fact“It’s loud.”
It is rarely loud enough to break a noise ordinance, but neighbors report the constant hum wears on them. One third of Virginia’s data centers sit near homes. Setbacks and better zoning can head this off before the first shovel.
JLARC Virginia, Dec 2024
Myth“It barely hires anyone.”
FactBuilding one takes about 1,500 workers at peak, and a typical building runs on about 50 full time, many of them electricians, HVAC techs and network techs. Virginia’s industry supports 74,000 jobs, mostly from construction. Google.org committed $50 million to skilled trades training across the US.
FactIn Loudoun County, data centers brought in 31% of local revenue in fiscal 2023, and the property tax rate fell from $1.145 in 2016 to $0.805 for 2026.
JLARC Virginia, Dec 2024 · Loudoun County · IBEW
Fact“They do it in secret.”
True too often. Tucson’s council unanimously rejected Project Blue in 2025 over water, energy and a “lack of transparency.” A judge voided Prince William County’s Digital Gateway rezoning because the public notice broke the law. Done right, Frederick County, Maryland got a $110 million community benefits deal: a school, a community center and career training.
AZ Luminaria · WTOP · Maryland Association of Counties, Sep 2026
Run the numbers yourself
Pro or against, it's your call. Every number below comes from the source under it, and nothing you enter leaves your device.
Text prompts to an AI chat app.
Water
0 to 0
liters
Electricity
0 to 0
kWh
These are benchmarks from two very different studies, not your exact footprint. The low end is Google's measured Gemini prompt in 2025, counting cooling water only. The high end is researchers' estimate for a GPT-3 response, counting the water used to make the electricity too. Long answers, images and reasoning modes can use more. Training the model and making the chips aren't counted.
Megawatts of IT load, the size proposals usually quote. Cooling and the rest of the building add more on top.
What it takes
Electricity a year
0 to 0 GWh
Water on site a year
0 to 0 million gal
Water at the power plants a year
0 to 0 million gal
Counted on the US grid mix where data centers sit.
Carbon a year
0 to 0 thousand tonnes CO2e
At the US grid average, location based. Companies buying clean power may report less under market based accounting.
Your power bill
PJM expected a 1.5% to 5% rise in some customers' bills in 2026/27, and prices fell in two zones. Virginia's watchdog estimated Dominion homes could pay $14 to $37 more a month by 2040 if demand grows fast.
What it gives
Construction
About 1,500 workers at peak
For a typical building, over 12 to 18 months.
Permanent jobs
About 50 full time
Per typical building, about half contract, averaging about $100,000 a year.
Local taxes
Data centers brought in from under 1% to 31% of local revenue in Virginia counties. Loudoun taxes their equipment at $4.15 per $100.
Good to know
Jobs and taxes don't scale neatly with megawatts, so these are for a typical building, not your number.
SMG-Ops
Fear fills the gap where numbers should be. Here are mine.
I run SMG-Ops. We build private intelligence inside businesses. A data center should leave the town stronger than it found it.
I’m already doing this kind of work:

Your rate stays your rate.
The data center pays its own way on power and water, so homeowners and renters don't eat the cost.

The jobs go to people from town.
Paid training with the community college and the trades, so electricians, HVAC techs and network techs come from town.

The town's water gets better, not worse.
The operator helps pay for water system upgrades the town needs anyway.

Anyone can check the math.
A public dashboard of water use, power use and local hires that anybody can check.
About SMG-Ops
Operators, developers and towns can hire us to do this work. We run the community side before the vote, with plain answers and an assistant residents can ask anything, answered from the real filings. We stand up the local training. We build the public dashboard.
I want data centers built. I also want them built where the water and the power can handle them, with the town at the table. Both can be true.
We go in.
Sources. Every figure is quoted from the agency, regulator, lab, pollster or company that published it. Events are from the named news outlets. Conversions to gallons are ours.
Lawrence Berkeley National Laboratory, 2024 United States Data Center Energy Usage Report, Dec 2024. lbl.gov
Google, Measuring the environmental impact of AI inference, Aug 21, 2025. cloud.google.com
Li, Yang, Islam and Ren, Making AI Less "Thirsty", UC Riverside, 2023, revised 2025. arxiv.org
GCSAA, Golf courses reduce water usage by 31 percent according to national survey, Dec 30, 2025. gcsaa.org
Ceres, Water Behind the Watts, Aug 25, 2026. ceres.org
Siddik, Shehabi and Marston, The environmental footprint of data centers in the United States, Environmental Research Letters, May 21, 2021. iopscience.iop.org
Gallup, AI data centers survey topline, Mar 2026. news.gallup.com
CBS News/YouGov, Americans on data centers in their area, Jun 2026. cbsnews.com
CJME, Graffiti at RM of Sherwood office, Apr 2026. cjme.com
Indiana Public Radio, Targeted shooting at home of Indy city-county councilor, Apr 2026. indianapublicradio.org
Futurism, Climate activists and Microsoft data center, Jul 19, 2026. futurism.com
Al Jazeera, Protesters break into Microsoft data centre site in Amsterdam, Nov 6, 2026. aljazeera.com
Wisconsin Watch, Data center secrecy deals, Jan 26, 2026. wisconsinwatch.org
PJM, 2026/2027 capacity auction results, Jul 22, 2025. pjm.com
Georgia Public Service Commission, Data center rule, Jan 23, 2025. psc.ga.gov
Virginia State Corporation Commission, Final Order PUR-2025-00058, Nov 25, 2025. scc.virginia.gov order (PDF)
JLARC Virginia, Data Centers in Virginia, Dec 9, 2024. jlarc.virginia.gov
OPB, The Dalles and Google's water demands, Jan 15, 2026. opb.org
Loudoun County, Data centers, tax revenues and the county budget. loudoun.gov
IBEW, Google funding means more jobs training for IBEW members. ibew.org
Microsoft, Community-First AI Infrastructure, Jan 13, 2026. blogs.microsoft.com
AZ Luminaria, Tucson City Council rejects Project Blue, Aug 6, 2025. azluminaria.org
WTOP, Judge voids Digital Gateway rezoning, Aug 2025. wtop.com
Google, Measuring the environmental impact of delivering AI at Google Scale, Aug 21, 2025. arxiv.org
Sam Altman, The Gentle Singularity. blog.samaltman.com
IEA, Electricity 2024, Jan 2024. iea.org
EPA WaterSense, Showerheads, 2026. epa.gov
EPA WaterSense, Residential Toilets, 2026. epa.gov
EIA, How much electricity does an American home use, 2024. eia.gov
EPA, eGRID2023 Summary Tables, Jun 12, 2025. epa.gov
Maryland Association of Counties, Frederick secures $110M community benefits agreement, Sep 2, 2026. mdcounties.org